Survey for Library project (August, 2009)

Dear our all class mates

We have questionnaires to take our colleagues' time to answer for our August project survey. Please kindly response below multiple choice, rank, scale and open and ended questions by your brilliant comment.

Thank a lot your time and pleasure

Sincerely

Project team

  1. Sai Oo
  2. Thiha
  3. Marco
  4. Nasa
  5. Hsapaw
  6. Kyinno
  7. Tapali Paw
  8. Nu Hlaing


Questionnaires of repairing library project

Please our classmates, kindly answer our Questionnaires to survey for repairing library in the comment box.

For example (No 1. 1. (a) 10. (a) My opinion is ……….. )

1. Our group project is repairing our library, how do you think?

(a) Strongly agree (b) agree (c) disagree (d) strongly agree

_________________________________________________________________

2. Our goal for our library project is, to cover noisy and keep book safely, to prevent entering of dust, bird or dog to make dirty. How do you think?

(a) Strongly like

(b) Like

(c) Okay

(d) Dislike

(e) strongly dislike

______________________________________________________________________

3. Our current library is getting noisy and dust, bird or dog are entering and making dirty?

Yes

No

OR anything else

___________________________________________________________________

4. When our group will repair library, which one is the most important?

(a) Cover the half of wall

(b) Change Zinc for rain drop from the roof

(c) Make new two book shelves

________________________________________________________________

5. If we repair the roof in the library, we will use Zinc or plastic panel which one is most suitable.

(a) Zinc

(b) Plastic panel


___________________________________________________________________

6. IF we cover the half of the wall of library, which material would you like to use?

(a) Poster board

(b) concrete

(c) plastic

(d) ply wood

_____________________________________________________________

7. If we cover the half wall of library, it is safe for noisy and bad smell with below materials: on scale safely

(a) Poster board

Low safe 1---------2---------3---------4-----------5 high safe

(b) Concrete

Low safe 1---------2---------3---------4-----------5 high safe

(c) Ply wood

Low safe 1---------2---------3---------4-----------5 high safe

(d) Plastic

Low safe 1---------2---------3---------4-----------5 high safe

___________________________________________________________________

8. On a scale, what construction skills do you have and help the project of library?

Cement construction skill

less 1---------2---------3---------4-----------5 expert

Wood construction skill

less 1---------2---------3---------4-----------5 expert


____________________________________________________________________


9. After repairing the library, it will effect to people more interesting to access?

less 1---------2---------3---------4-----------5 more

__________________________________________________________________

10. Please give (3) things of opinion for our repairing library project.

(a)

(b)

(c)

__________________________________________________________________

11. After finishing our library project, who will take responsibility to take library?

(a) teacher

(b) Coordinator

(c) 23 students

(d) Project manager

___________________________________________________________________

12. How do you feel, if you use the library?

___________________________________________________________________

13. Will our project help library to be more perfect? Why?/why not?

___________________________________________________________________

14. In a normal library, what are the things do us to keep in there?

____________________________________________________________________

15. ANY comment


____________________________________________________________________

0 comments:

Post a Comment