Dear our all class mates
We have questionnaires to take our colleagues' time to answer for our August project survey. Please kindly response below multiple choice, rank, scale and open and ended questions by your brilliant comment.
Thank a lot your time and pleasure
Sincerely
Project team
- Sai Oo
- Thiha
- Marco
- Nasa
- Hsapaw
- Kyinno
- Tapali Paw
- Nu Hlaing
Questionnaires of repairing library project
Please our classmates, kindly answer our Questionnaires to survey for repairing library in the comment box.
For example (No 1. 1. (a) 10. (a) My opinion is ……….. )
1. Our group project is repairing our library, how do you think?
(a) Strongly agree (b) agree (c) disagree (d) strongly agree
_________________________________________________________________
2. Our goal for our library project is, to cover noisy and keep book safely, to prevent entering of dust, bird or dog to make dirty. How do you think?
(a) Strongly like
(b) Like
(c) Okay
(d) Dislike
(e) strongly dislike
3. Our current library is getting noisy and dust, bird or dog are entering and making dirty?
Yes
No
OR anything else
___________________________________________________________________
4. When our group will repair library, which one is the most important?
(a) Cover the half of wall
(b) Change Zinc for rain drop from the roof
(c) Make new two book shelves
________________________________________________________________
5. If we repair the roof in the library, we will use Zinc or plastic panel which one is most suitable.
(a) Zinc
(b) Plastic panel
___________________________________________________________________
6. IF we cover the half of the wall of library, which material would you like to use?
(a) Poster board
(b) concrete
(c) plastic
(d) ply wood
_____________________________________________________________
7. If we cover the half wall of library, it is safe for noisy and bad smell with below materials: on scale safely
(a) Poster board
Low safe 1---------2---------3---------4-----------5 high safe
(b) Concrete
Low safe 1---------2---------3---------4-----------5 high safe
(c) Ply wood
Low safe 1---------2---------3---------4-----------5 high safe
(d) Plastic
Low safe 1---------2---------3---------4-----------5 high safe
8. On a scale, what construction skills do you have and help the project of library?
Cement construction skill
less 1---------2---------3---------4-----------5 expert
Wood construction skill
less 1---------2---------3---------4-----------5 expert
____________________________________________________________________
9. After repairing the library, it will effect to people more interesting to access?
less 1---------2---------3---------4-----------5 more
__________________________________________________________________
10. Please give (3) things of opinion for our repairing library project.
(a)
(b)
(c)
__________________________________________________________________
11. After finishing our library project, who will take responsibility to take library?
(a) teacher
(b) Coordinator
(c) 23 students
(d) Project manager
___________________________________________________________________
12. How do you feel, if you use the library?
___________________________________________________________________
13. Will our project help library to be more perfect? Why?/why not?
___________________________________________________________________
14. In a normal library, what are the things do us to keep in there?
____________________________________________________________________
15. ANY comment
____________________________________________________________________
0 comments: